{"id":1312,"date":"2023-02-27T11:58:47","date_gmt":"2023-02-27T11:58:47","guid":{"rendered":"https:\/\/taqas.net\/en\/?p=1312"},"modified":"2023-02-27T11:59:30","modified_gmt":"2023-02-27T11:59:30","slug":"bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation","status":"publish","type":"post","link":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/","title":{"rendered":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation"},"content":{"rendered":"\n<p class=\"has-medium-font-size wp-block-paragraph\">bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.<br>The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures<br>(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as the basis for the<br>GTA Phase 2 expansion project (GTA2) with total capacity of between 2.5-3.0 million tonnes per<br>annum.<br>GBS LNG developments have a static connection to the seabed with the structure providing<br>LNG storage and a foundation for liquefication facilities.<br>The concept design will also include new wells and subsea equipment, integrating with and<br>expanding on existing GTA infrastructure. The partnership will consider powering LNG<br>liquefication using electricity to help drive operational emissions lower. bp and its partners are<br>now working with contractors to progress the concept towards the pre-FEED stage.<br>Gordon Birrell, bp\u2019s executive vice president for operations and production, said: \u201cWe aim to<br>build on our strong collaboration with our partners, and the Governments of Mauritania and<br>Senegal, to further develop a long-term, successful energy hub in West Africa. GTA continues<br>to underpin our strategy to develop the most resilient hydrocarbons to help provide energy<br>security today.\u201d<br>GTA is located 120km offshore in water depth of 2850m, one of the deepest subsea<br>developments in Africa. Phase 1 \u2013 currently under development &#8211; will export gas to an FPSO<br>approximately 40km offshore where the gas will be processed and liquids separated, before<br>exporting gas onward to floating LNG facilities 10km offshore. It is expected to produce around 2.3 million tonnes of LNG per year when operations commence.<br>In July 2021, the GTA project was granted the status of \u2018National Project of Strategic Importance\u2019 by the Presidents of Mauritania and Senegal. This recognition demonstrates the<br>commitment of the host governments and the significance of the project to both countries.<br>bp and the two Governments already have a long-standing and wide-ranging cooperation<br>encompassing the GTA project and other potential energy developments. In October 2022,<br>bp announced the signature of an exploration and production sharing contract for the BirAllah<br>gas resource in Mauritania. In addition, bp continues to work with partners on the evelopment<br>of a major gas-to-power project in Senegal, Yakaar Teranga.<br>Most recently, bp signed a memorandum of understanding (MoU) with the Government of<br>Mauritania to deliver a programme exploring the potential for large-scale production of green<br>hydrogen in the country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as &hellip;<\/p>\n","protected":false},"author":2,"featured_media":1313,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[37,111,120,62,115,110,138],"class_list":["post-1312","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oil-gas-mauritania","tag-bp","tag-gas","tag-gta","tag-kosmos-energy","tag-mauritania","tag-oil","tag-senegal"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Mohamed Eka\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Taqa -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa\" \/>\n\t\t<meta property=\"og:description\" content=\"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-02-27T11:58:47+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-02-27T11:59:30+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa\" \/>\n\t\t<meta name=\"twitter:description\" content=\"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#blogposting\",\"name\":\"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa\",\"headline\":\"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation\",\"author\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/GTA-3-scaled.jpg\",\"width\":2560,\"height\":1917},\"datePublished\":\"2023-02-27T11:58:47+00:00\",\"dateModified\":\"2023-02-27T11:59:30+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#webpage\"},\"articleSection\":\"Oil &amp; Gas, BP, gas, GTA, kosmos energy, Mauritania, oil, Senegal\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/taqas.net\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/#listItem\",\"name\":\"Oil &amp; Gas\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/#listItem\",\"position\":2,\"name\":\"Oil &amp; Gas\",\"item\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#listItem\",\"name\":\"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#listItem\",\"position\":3,\"name\":\"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/#listItem\",\"name\":\"Oil &amp; Gas\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#organization\",\"name\":\"taqas\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/\",\"name\":\"Mohamed Eka\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b8b553f6c5aa208f328992148403de21b8df73ea65785e1cd9a545fbb9a646ac?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Mohamed Eka\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#webpage\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/\",\"name\":\"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa\",\"description\":\"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \\u2013 composed of bp, PETROSEN, Soci\\u00e9t\\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \\u2013 will evaluate a gravity-based structure (GBS) as\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/GTA-3-scaled.jpg\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#mainImage\",\"width\":2560,\"height\":1917},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\\\/#mainImage\"},\"datePublished\":\"2023-02-27T11:58:47+00:00\",\"dateModified\":\"2023-02-27T11:59:30+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/\",\"name\":\"Taqa\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa","description":"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as","canonical_url":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#blogposting","name":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa","headline":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation","author":{"@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author"},"publisher":{"@id":"https:\/\/taqas.net\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/taqas.net\/en\/wp-content\/uploads\/2023\/02\/GTA-3-scaled.jpg","width":2560,"height":1917},"datePublished":"2023-02-27T11:58:47+00:00","dateModified":"2023-02-27T11:59:30+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#webpage"},"isPartOf":{"@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#webpage"},"articleSection":"Oil &amp; Gas, BP, gas, GTA, kosmos energy, Mauritania, oil, Senegal"},{"@type":"BreadcrumbList","@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/taqas.net\/en#listItem","position":1,"name":"Home","item":"https:\/\/taqas.net\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/#listItem","name":"Oil &amp; Gas"}},{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/#listItem","position":2,"name":"Oil &amp; Gas","item":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/","nextItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#listItem","name":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation"},"previousItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#listItem","position":3,"name":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation","previousItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/#listItem","name":"Oil &amp; Gas"}}]},{"@type":"Organization","@id":"https:\/\/taqas.net\/en\/#organization","name":"taqas","url":"https:\/\/taqas.net\/en\/"},{"@type":"Person","@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author","url":"https:\/\/taqas.net\/en\/author\/medeka\/","name":"Mohamed Eka","image":{"@type":"ImageObject","@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/b8b553f6c5aa208f328992148403de21b8df73ea65785e1cd9a545fbb9a646ac?s=96&d=mm&r=g","width":96,"height":96,"caption":"Mohamed Eka"}},{"@type":"WebPage","@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#webpage","url":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/","name":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa","description":"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/taqas.net\/en\/#website"},"breadcrumb":{"@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#breadcrumblist"},"author":{"@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author"},"creator":{"@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/taqas.net\/en\/wp-content\/uploads\/2023\/02\/GTA-3-scaled.jpg","@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#mainImage","width":2560,"height":1917},"primaryImageOfPage":{"@id":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/#mainImage"},"datePublished":"2023-02-27T11:58:47+00:00","dateModified":"2023-02-27T11:59:30+00:00"},{"@type":"WebSite","@id":"https:\/\/taqas.net\/en\/#website","url":"https:\/\/taqas.net\/en\/","name":"Taqa","inLanguage":"en-US","publisher":{"@id":"https:\/\/taqas.net\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Taqa -","og:type":"article","og:title":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa","og:description":"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as","og:url":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/","article:published_time":"2023-02-27T11:58:47+00:00","article:modified_time":"2023-02-27T11:59:30+00:00","twitter:card":"summary_large_image","twitter:title":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation - Taqa","twitter:description":"bp and partners today confirmed the development concept for the second phase of the bpoperated Greater Tortue Ahmeyim (GTA) liquefied natural gas (LNG) project that they will takeforward to the next stage of evaluation.The partnership \u2013 composed of bp, PETROSEN, Soci\u00e9t\u00e9 Mauritanienne des Hydrocarbures(SMH) and Kosmos Energy \u2013 will evaluate a gravity-based structure (GBS) as"},"aioseo_meta_data":{"post_id":"1312","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2023-02-27 11:58:48","updated":"2026-08-17 15:15:55","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/taqas.net\/en\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/\" title=\"Oil &amp; Gas\">Oil &amp; Gas<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tbp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/taqas.net\/en"},{"label":"Oil &amp; Gas","link":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/"},{"label":"bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation","link":"https:\/\/taqas.net\/en\/bp-and-partners-progress-concept-for-greater-tortue-ahmeyim-gta-phase-2-to-next-phase-of-evaluation\/"}],"_links":{"self":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts\/1312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/comments?post=1312"}],"version-history":[{"count":2,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts\/1312\/revisions"}],"predecessor-version":[{"id":1315,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts\/1312\/revisions\/1315"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/media\/1313"}],"wp:attachment":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/media?parent=1312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/categories?post=1312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/tags?post=1312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}