{"id":1361,"date":"2023-10-06T08:50:22","date_gmt":"2023-10-06T08:50:22","guid":{"rendered":"https:\/\/taqas.net\/en\/?p=1361"},"modified":"2023-10-06T08:50:23","modified_gmt":"2023-10-06T08:50:23","slug":"allseas-wins-pipelay-contract-for-bps-biggest-project","status":"publish","type":"post","link":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/","title":{"rendered":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019"},"content":{"rendered":"\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal.<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between 1,500 and 2,800 meters and four 10-inch CRA infield lines with FTAs up two kilometers long in 2,800 meters of water.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Allseas will carry out the offshore pipelay works in early December using its construction vessel Pioneering Spirit, with installation support set to be provided by the construction support vessel (CSV) Oceanic.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The commercial and engineering teams of the two companies evaluated the technical feasibility of installing the pipelines and subsea structures, which were originally designed for installation with a J-lay solution.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">To install the 10 FTAs, Pioneering Spirit will be fitted with a special 1,000-tonne J-mode installation frame, designed in-house and built at Allseas\u2019 Heijningen fabrication yard in the Netherlands.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><em>\u201cThis agreement demonstrates both our willingness and ability to take on highly complex and pipelay projects with fast-track planning and execution scopes,\u201d<\/em>&nbsp;said&nbsp;<strong>Pieter Heerema<\/strong>, Chief Executive of Allseas.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><em>\u201cWe are excited to work with bp on this project, this opportunity re-establishes the partnership between our two companies and creates a platform on which to grow and strengthen future collaboration between bp and Allseas.\u201d<\/em><\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">As previously reported, BP sees the&nbsp;<a href=\"https:\/\/www.offshore-energy.biz\/bps-giant-incoming-hydrocarbon-projects-to-watch-in-2023\/\" target=\"_blank\" rel=\"noreferrer noopener\">GTA gas development<\/a>&nbsp;as&nbsp;<em>\u201cthe biggest project\u201d&nbsp;<\/em>in its portfolio, which has<em>&nbsp;\u201cenough gas to support production for at least 20 years.\u201d<\/em><\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The project is located around 40 kilometers offshore, on the maritime border of Mauritania and Senegal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source : offshore energy<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between &hellip;<\/p>\n","protected":false},"author":2,"featured_media":1362,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[37,111,120,115,110,138],"class_list":["post-1361","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oil-gas-mauritania","tag-bp","tag-gas","tag-gta","tag-mauritania","tag-oil","tag-senegal"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Mohamed Eka\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Taqa -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019 - Taqa\" \/>\n\t\t<meta property=\"og:description\" content=\"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-10-06T08:50:22+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-10-06T08:50:23+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019 - Taqa\" \/>\n\t\t<meta name=\"twitter:description\" content=\"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#blogposting\",\"name\":\"Allseas wins pipelay contract for BP\\u2019s \\u2018biggest project\\u2019 - Taqa\",\"headline\":\"Allseas wins pipelay contract for BP\\u2019s \\u2018biggest project\\u2019\",\"author\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Allseas-wins-pipelay-contract-for-BPs-biggest-project.webp\",\"width\":1484,\"height\":859},\"datePublished\":\"2023-10-06T08:50:22+00:00\",\"dateModified\":\"2023-10-06T08:50:23+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#webpage\"},\"articleSection\":\"Oil &amp; Gas, BP, gas, GTA, Mauritania, oil, Senegal\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/taqas.net\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/#listItem\",\"name\":\"Oil &amp; Gas\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/#listItem\",\"position\":2,\"name\":\"Oil &amp; Gas\",\"item\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#listItem\",\"name\":\"Allseas wins pipelay contract for BP\\u2019s \\u2018biggest project\\u2019\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#listItem\",\"position\":3,\"name\":\"Allseas wins pipelay contract for BP\\u2019s \\u2018biggest project\\u2019\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/category\\\/oil-gas-mauritania\\\/#listItem\",\"name\":\"Oil &amp; Gas\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#organization\",\"name\":\"taqas\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/\",\"name\":\"Mohamed Eka\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b8b553f6c5aa208f328992148403de21b8df73ea65785e1cd9a545fbb9a646ac?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Mohamed Eka\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#webpage\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/\",\"name\":\"Allseas wins pipelay contract for BP\\u2019s \\u2018biggest project\\u2019 - Taqa\",\"description\":\"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/author\\\/medeka\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Allseas-wins-pipelay-contract-for-BPs-biggest-project.webp\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#mainImage\",\"width\":1484,\"height\":859},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/allseas-wins-pipelay-contract-for-bps-biggest-project\\\/#mainImage\"},\"datePublished\":\"2023-10-06T08:50:22+00:00\",\"dateModified\":\"2023-10-06T08:50:23+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/taqas.net\\\/en\\\/\",\"name\":\"Taqa\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/taqas.net\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019 - Taqa","description":"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between","canonical_url":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#blogposting","name":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019 - Taqa","headline":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019","author":{"@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author"},"publisher":{"@id":"https:\/\/taqas.net\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/taqas.net\/en\/wp-content\/uploads\/2023\/10\/Allseas-wins-pipelay-contract-for-BPs-biggest-project.webp","width":1484,"height":859},"datePublished":"2023-10-06T08:50:22+00:00","dateModified":"2023-10-06T08:50:23+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#webpage"},"isPartOf":{"@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#webpage"},"articleSection":"Oil &amp; Gas, BP, gas, GTA, Mauritania, oil, Senegal"},{"@type":"BreadcrumbList","@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/taqas.net\/en#listItem","position":1,"name":"Home","item":"https:\/\/taqas.net\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/#listItem","name":"Oil &amp; Gas"}},{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/#listItem","position":2,"name":"Oil &amp; Gas","item":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/","nextItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#listItem","name":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019"},"previousItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#listItem","position":3,"name":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019","previousItem":{"@type":"ListItem","@id":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/#listItem","name":"Oil &amp; Gas"}}]},{"@type":"Organization","@id":"https:\/\/taqas.net\/en\/#organization","name":"taqas","url":"https:\/\/taqas.net\/en\/"},{"@type":"Person","@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author","url":"https:\/\/taqas.net\/en\/author\/medeka\/","name":"Mohamed Eka","image":{"@type":"ImageObject","@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/b8b553f6c5aa208f328992148403de21b8df73ea65785e1cd9a545fbb9a646ac?s=96&d=mm&r=g","width":96,"height":96,"caption":"Mohamed Eka"}},{"@type":"WebPage","@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#webpage","url":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/","name":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019 - Taqa","description":"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/taqas.net\/en\/#website"},"breadcrumb":{"@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#breadcrumblist"},"author":{"@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author"},"creator":{"@id":"https:\/\/taqas.net\/en\/author\/medeka\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/taqas.net\/en\/wp-content\/uploads\/2023\/10\/Allseas-wins-pipelay-contract-for-BPs-biggest-project.webp","@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#mainImage","width":1484,"height":859},"primaryImageOfPage":{"@id":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/#mainImage"},"datePublished":"2023-10-06T08:50:22+00:00","dateModified":"2023-10-06T08:50:23+00:00"},{"@type":"WebSite","@id":"https:\/\/taqas.net\/en\/#website","url":"https:\/\/taqas.net\/en\/","name":"Taqa","inLanguage":"en-US","publisher":{"@id":"https:\/\/taqas.net\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Taqa -","og:type":"article","og:title":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019 - Taqa","og:description":"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between","og:url":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/","article:published_time":"2023-10-06T08:50:22+00:00","article:modified_time":"2023-10-06T08:50:23+00:00","twitter:card":"summary_large_image","twitter:title":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019 - Taqa","twitter:description":"UK energy giant BP has awarded Allseas with a contract to perform the subsea pipelay scope for the Greater Tortue Ahmeyim (GTA) natural gas project offshore Mauritania and Senegal. The contract includes the installation of circa 75 kilometers outstanding on the two 16-inch export pipelines with field termination assemblies (FTAs) in water depths of between"},"aioseo_meta_data":{"post_id":"1361","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2023-10-06 08:50:23","updated":"2026-08-17 15:44:16","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/taqas.net\/en\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/\" title=\"Oil &amp; Gas\">Oil &amp; Gas<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tAllseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/taqas.net\/en"},{"label":"Oil &amp; Gas","link":"https:\/\/taqas.net\/en\/category\/oil-gas-mauritania\/"},{"label":"Allseas wins pipelay contract for BP\u2019s \u2018biggest project\u2019","link":"https:\/\/taqas.net\/en\/allseas-wins-pipelay-contract-for-bps-biggest-project\/"}],"_links":{"self":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts\/1361","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/comments?post=1361"}],"version-history":[{"count":1,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts\/1361\/revisions"}],"predecessor-version":[{"id":1363,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/posts\/1361\/revisions\/1363"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/media\/1362"}],"wp:attachment":[{"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/media?parent=1361"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/categories?post=1361"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/taqas.net\/en\/wp-json\/wp\/v2\/tags?post=1361"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}